FRP sheeting assemble and unassemble and the construction notice

Release time:

2024-09-05

The workers stand every other 3 meters,hole the two sides of the sheeting.The height be the same with thehead.In avoid of breaking the sheeting,every 2-3 pieces handle at the same time.

FRP sheeting assemble and unassemble notice
1. When assemble and unassemble,need to avoid the bottom and two sides damage when pulling then damage the surface.

2. The workers stand every other 3 meters,hole the two sides of the sheeting.The height be the same with thehead.In avoid of breaking the sheeting,every 2-3 pieces handle at the same time.

3. When putting the sheets,need to pile up on the firm and level ground.Should be protected by packing plates onthe top and bottom. Strictly prohibit heavy things on the top or people trample.The height of every pile is no exceedthan 0.75m.
4. The settled sheetings should be tied by ropes in case of blowing away by the wind.5. in the course of liftina to the roofstrictly prohibit bending vertical and horizontalin case of breakina lf thecondition of the scene is not good,when the workers lifting,need to set lifting point every 2-3meters,lifting at thesame time in every point.

The notice of FRP sheeting construction
The construction of FRP sheeting needs to according to the AS/NZS1562.3:1996 stipulation.These are theinstructions of the construction:
1. The construction of FRP sheeting need to construct from the cornice to the ridge direction step by step.The two sides of the FRP sheeting crest directly button in the steel sheet side crest.

2. The aperture should bigger than the bolt diameter6-9mm,as the function of heat makes it expand and colcmakes it contract.
3. Paste two 2*20mm butyl water stop tape on the top of the FRP sheet lap joint.When the FRP sheet longitudinaoverlap,it should be over 250mm overlap on the telos.4. After setting the hole of every crest,put the specially use EPDM waterproof washer into the self-tapping screw7. Using the electric drill to lock the self-tapping screw which has the EPDM gasket into the purline,then it finishesthe settled working of the FRP sheet.
PS:Step on the surface of the FRP sheeting is strictly forbidden.

Setting up/fixation

The construction way of setting FRP sheeting

Welcome to our website
If you are interested in our products and services, please contact us or leave us a message, we will serve you wholeheartedly!